溝渠模具的應用非常廣泛,除了在農田灌溉水利方面,在高鐵、高速公路等其他工程領域的排水也在使用。水利灌溉溝渠模具內部設計是按照具體R的弧度而言,弧度的大小決定了該模具制作的難易程度等。一般U型槽構件的使用會經過長時間的養護后才會搬到施工現場。U型槽模具因為內部構造的特殊性,往往需要在整張鋼板上進行折彎設計,這樣才能保證混凝土預制塊的光滑度,而且不會因為多次使用而發生開裂或者變形的現象。
Ditch mold is widely used, in addition to irrigation and water conservancy, in high-speed rail, highway and other engineering fields of drainage is also used. The internal design of U-groove die is based on the radian of specific R, which determines the difficulty of making the die. Generally, the use of U-groove components will be moved to the construction site after a long period of maintenance. Because of the particularity of the internal structure, the U-groove mold often needs to be bent on the whole steel plate, so as to ensure the smoothness of the precast concrete block, and will not crack or deform due to repeated use.
溝渠模具使用的混凝土的規格標號應該嚴格按照設計圖紙內容來,而且使用的技術應該達標,符合生產的規范要求,混凝土在攪拌之前要檢查一些原材料的質量,然后按照設計好的比例進行混合,在攪拌的時候要時刻注意混凝土的含水量,同時要及時進行調整,保證混凝土的質量符合要求,混凝土在攪拌好以后需要在兩個小時以內就使用,在進行振搗的時候要注意混凝土的密實程度,要是保證混凝土質量的重要措施,而且使用振動平臺的時候要嚴格控制振動時間,既要讓里面的混凝土變得均勻也不要出現過振的狀況,通常都是在二十秒到三十秒之間就可以了。水利灌溉溝渠模具在混凝土振動完成以后要有六個小時的灑水養護時間,而在夏季的時候應該進行覆蓋,避免日光的直接照射,這樣才能保證流水槽的硬度和質量。鐵路流水槽模具是專門設計為鐵路排水而使用的,所以具有針對性,符合鐵路運輸使用的規定。
The specification and label of concrete used in ditch mould shall be strictly in accordance with the design drawings, and the technology used shall meet the requirements of production specifications. Before mixing, the quality of some raw materials shall be checked, and then mixed according to the designed proportion. During mixing, the water content of concrete shall be paid attention to at all times, and the adjustment shall be made in time, Ensure the quality of concrete meets the requirements. After mixing, concrete shall be used within two hours. When vibrating, attention shall be paid to the density of concrete. If important measures to ensure the quality of concrete are taken, and vibration time shall be strictly controlled when using vibration platform, so as to make the concrete in it even and avoid excessive vibration, It's usually between 20 and 30 seconds. After the concrete vibration is completed, the water irrigation ditch mould shall have six hours of watering and curing time. In summer, it should be covered to avoid direct sunlight exposure, so as to ensure the hardness and quality of the water trough. The mould of railway water trough is specially designed for railway drainage, so it is targeted and conforms to the regulations of railway transportation.